Universitas Islam Bandung Repository

Stabilisasi Optimal Lereng Timbunan Overburden pada Area Disposal PT Insani Baraperkasa Tambang Loa Janan, Provinsi Kalimantan Timur Dengan Rekayasa Geoteknik

Show simple item record

dc.contributor Fakultas Teknik
dc.contributor
dc.creator Andriyan, Syahril Huda
dc.creator Hirnawan, Febri
dc.creator Yuliadi, Yuliadi
dc.date 2018-08-06
dc.date.accessioned 2019-09-12T01:48:28Z
dc.date.available 2019-09-12T01:48:28Z
dc.identifier http://karyailmiah.unisba.ac.id/index.php/pertambangan/article/view/11701
dc.identifier.uri http://hdl.handle.net/123456789/22666
dc.description Abstract. The practice of overburden stockpiling in the low wall area may occur as the landslide like occurred in North and South Pit at PT Insani Baraperkasa (PT IBP) - Loa Janan Mine. The landslide is feared will extend to high wall and could distrub the mining process. With a limited landfill area of 862,216 m2, geotechnical engineering is carried out to get the optimum disposal slope model but still safe (not landslide) and overburden hoarding activities in the low wall area that has been carried out at this time is 5,229,337.75 LCM can increased to 20,000,000 LCM targeted by PT Insani Baraperkasa. The research methodology used such as literature study, data collection (field observation and laboratory testing), and analysis of slope stability by using Limited Equilibrium Method to obtain optimal slope management. The result of this research is known the safe disposal model can use a model in the height of 100 meter with overall slope angle of 12° with an overburden volume that can be accommodated at 8.269.529,9 LCM for stabilization based on geometrical with Safety Factor (SF) value of landfill increased to 1,300 from 0,630.Keywords: Geotechnical Engineering, Disposal, Slope Stability, Safety Factor. Abstrak. Dalam pelaksanaannya penimbunan overburden di area low wall dapat menyebabkan longsor sebagaimana yang terjadi pada Pit Utara dan Selatan PT Insani Baraperkasa (PT IBP) – Tambang Loa Janan. Longsoran yang telah terjadi tersebut dikhawatirkan akan meluas ke arah high wall, sehingga dapat mengganggu proses penambangan yang sedang berlangsung. Dengan luas lahan penimbunan yang terbatas seluas 862.216 m2, maka perlu dilakukan rekayasa geoteknik untuk mendapatkan model lereng timbunan yang optimum namun tetap aman (tidak longsor) serta kegiatan penimbunan overburden di area low wall yang telah dilakukan saat ini sebesar 5.229.337,75 LCM dapat ditingkatkan sampai 20.000.000 LCM sesuai dengan target PT Insani Baraperkasa. Kegiatan penelitian memiliki beberapa tahapan seperti Studi literatur, Pengambilan Data (Observasi lapangan dan Pengujian laboratorium), dan Analisis data kestabilan lereng dengan metode kesetimbangan batas (Limited Equilibrium Method) untuk mendapatkan desain lereng yang optimal. Dari penelitian ini diketahui bahwa model timbunan yang aman dan ekonomis berupa model dengan tinggi lereng keseluruhan 100 meter dengan sudut lereng 12° dengan volume overburden yang dapat ditampung sebesar 8.269.529,9 LCM berdasarkan stabilisasi berupa perubahan geometri dengan peningkatan faktor keamanan (FK) menjadi 1,300 dari 0,630.Kata Kunci: Rekayasa Geoteknik, Timbunan, Kestabilan Lereng, Faktor Keamanan.
dc.description Abstract. The practice of overburden stockpiling in the low wall area may occur as the landslide like occurred in North and South Pit at PT Insani Baraperkasa (PT IBP) - Loa Janan Mine. The landslide is feared will extend to high wall and could distrub the mining process. With a limited landfill area of 862,216 m2, geotechnical engineering is carried out to get the optimum disposal slope model but still safe (not landslide) and overburden hoarding activities in the low wall area that has been carried out at this time is 5,229,337.75 LCM can increased to 20,000,000 LCM targeted by PT Insani Baraperkasa. The research methodology used such as literature study, data collection (field observation and laboratory testing), and analysis of slope stability by using Limited Equilibrium Method to obtain optimal slope management.The result of this research is known the safe disposal model can use a model in the height of 100 meter with overall slope angle of 12° with an overburden volume that can be accommodated at 8.269.529,9 LCM for stabilization based on geometrical with Safety Factor (SF) value of landfill increased to 1,300 from 0,630.Abstrak. Dalam pelaksanaannya penimbunan overburden di area low wall dapat menyebabkan longsor sebagaimana yang terjadi pada Pit Utara dan Selatan PT Insani Baraperkasa (PT IBP) – Tambang Loa Janan. Longsoran yang telah terjadi tersebut dikhawatirkan akan meluas ke arah high wall, sehingga dapat mengganggu proses penambangan yang sedang berlangsung. Dengan luas lahan penimbunan yang terbatas seluas 862.216 m2, maka perlu dilakukan rekayasa geoteknik untuk mendapatkan model lereng timbunan yang optimum namun tetap aman (tidak longsor) serta kegiatan penimbunan overburden di area low wall yang telah dilakukan saat ini sebesar 5.229.337,75 LCM dapat ditingkatkan sampai 20.000.000 LCM sesuai dengan target PT Insani Baraperkasa. Kegiatan penelitian memiliki beberapa tahapan seperti Studi literatur, Pengambilan Data (Observasi lapangan dan Pengujian laboratorium), dan Analisis data kestabilan lereng dengan metode kesetimbangan batas (Limited Equilibrium Method) untuk mendapatkan desain lereng yang optimal.Dari penelitian ini diketahui bahwa model timbunan yang aman dan ekonomis berupa model dengan tinggi lereng keseluruhan 100 meter dengan sudut lereng 12° dengan volume overburden yang dapat ditampung sebesar 8.269.529,9 LCM berdasarkan stabilisasi berupa perubahan geometri dengan peningkatan faktor keamanan (FK) menjadi 1,300 dari 0,630.
dc.format application/pdf
dc.language eng
dc.publisher Universitas Islam Bandung
dc.relation http://karyailmiah.unisba.ac.id/index.php/pertambangan/article/view/11701/pdf
dc.rights Copyright (c) 2018 Prosiding Teknik Pertambangan
dc.source Prosiding Teknik Pertambangan; Vol 4, No 2, Prosiding Teknik Pertambangan (Agustus, 2018); 391-397
dc.source Prosiding Teknik Pertambangan; Vol 4, No 2, Prosiding Teknik Pertambangan (Agustus, 2018); 391-397
dc.source 2460-6499
dc.subject Teknik Pertambangan
dc.subject Rekayasa Geoteknik, Timbunan, Kestabilan Lereng, Faktor Keamanan
dc.subject
dc.subject Rekayasa Geoteknik, Timbunan, Kestabilan Lereng, Faktor Keamanan
dc.title Stabilisasi Optimal Lereng Timbunan Overburden pada Area Disposal PT Insani Baraperkasa Tambang Loa Janan, Provinsi Kalimantan Timur Dengan Rekayasa Geoteknik
dc.title STABILISASI OPTIMAL LERENG TIMBUNAN OVERBURDEN PADA AREA DISPOSAL PT INSANI BARAPERKASA TAMBANG LOA JANAN, PROVINSI KALIMANTAN TIMUR DENGAN REKAYASA GEOTEKNIK
dc.type info:eu-repo/semantics/article
dc.type info:eu-repo/semantics/publishedVersion
dc.type Peer-reviewed Article
dc.type Kuantitatif
dc.type


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search Unisba Repository


Browse

My Account