Universitas Islam Bandung Repository

Analisis Perencanaan Persediaan Bahan Baku pada Produk Knalpot Matic SND Semi Racing Harian Motor Honda Beat dengan Menggunakan Metode MRP (Material Requirement Planning) untuk Meminimumkan Biaya Persediaan di PT. Sandy Globalindo Bandung

Show simple item record

dc.contributor Fakultas Ekonomi dan Bisnis
dc.contributor
dc.creator Setiadi, Kiki
dc.creator Aspiranti, Tasya
dc.date 2018-08-09
dc.date.accessioned 2019-09-13T04:14:01Z
dc.date.available 2019-09-13T04:14:01Z
dc.identifier http://karyailmiah.unisba.ac.id/index.php/manajemen/article/view/11611
dc.identifier.uri http://hdl.handle.net/123456789/25161
dc.description Abstract : This study aims to determine and analyze the preparation of raw materials Muffler Matic Semi Racing SND Daily Honda Beat Motor at PT. Sandy Globalindo by using Material Requirement Planning (MRP) to minimize costs. The type of this research which in this research is descriptive and this research type which in this research is case study. Data sender technique used in this research is data technical data used to perform data at PT. Sandy Globalindo, Observation to know the state of manufacture of Matic Semi Racing Muffler SND Daily Honda Beat Motor, Documentation to analyze documents that can be accessed at PT. Sandy Globalindo. The results of this study show that the strategy after using Lot For Lot and Part Period Balancing the results obtained after using LFL and PPB is more efficient than LFL, the total cost of preparation from both methods is LFL Rp.960.000 and PPB Rp.683.386,3.Keywords: Material Requirement Method of Planning, Bill Of Material, Lot For Lot, Period of Balancing SectionAbstrak : Penelitian ini bertujuan untuk mengetahui dan menganalisis persediaan bahan baku Knalpot Matic Semi Racing SND Harian Motor Honda Beat di PT. Sandy Globalindo dengan menggunakan Material Requirement Planning (MRP) untuk meminimumkan biaya. Jenis penelitian ini yang digunakan dalam penelitian ini adalah deskriptif dan kuantitatif dan jenis penelitian ini yang digunakan dalam penelitian ini adalah studi kasus. Teknik pengumpulan data yang digunakan dalam penelitian ini adalah teknik pengumpulan data lapangan yaitu dilakukan Wawancara untuk mendapatkan data-data di PT. Sandy Globalindo, Observasi untuk mengetahui keadaan pembuatan Knalpot Matic Semi Racing SND Harian Motor Honda Beat, Dokumentasi untuk menganalisis dokumen-dokumen yang di dapat di PT. Sandy Globalindo. Hasil perhitungan yang didapat dari penelitian ini menunjukan bahwa strategi setelah menggunakan Lot For Lot dan Part Periode Balancing hasil yang diperoleh setelah menggunakan LFL dan PPB lebih efisien dari pada LFL, total biaya persediaan dari kedua metode tersebut yaitu, LFL sebesar Rp.960.000 dan PPB sebesar Rp.683.386,3Kata kunci: Metode Material Requirement Planning, Bill Of Material, Lot For Lot, Periode Part Balancing
dc.description Abstract : This study aims to determine and analyze the preparation of raw materials Muffler Matic Semi Racing SND Daily Honda Beat Motor at PT. Sandy Globalindo by using Material Requirement Planning (MRP) to minimize costs. The type of this research which in this research is descriptive and this research type which in this research is case study. Data sender technique used in this research is data technical data used to perform data at PT. Sandy Globalindo, Observation to know the state of manufacture of Matic Semi Racing Muffler SND Daily Honda Beat Motor, Documentation to analyze documents that can be accessed at PT. Sandy Globalindo. The results of this study show that the strategy after using Lot For Lot and Part Period Balancing the results obtained after using LFL and PPB is more efficient than LFL, the total cost of preparation from both methods is LFL Rp.960.000 and PPB Rp.683.386,3.Keywords: Material Requirement Method of Planning, Bill Of Material, Lot For Lot, Period of Balancing Section
dc.format application/pdf
dc.language eng
dc.publisher Universitas Islam Bandung
dc.relation http://karyailmiah.unisba.ac.id/index.php/manajemen/article/view/11611/pdf
dc.rights Copyright (c) 2018 Prosiding Manajemen
dc.source Prosiding Manajemen; Vol 4, No 2, Prosiding Manajemen (Agustus, 2018); 622-628
dc.source Prosiding Manajemen; Vol 4, No 2, Prosiding Manajemen (Agustus, 2018); 622-628
dc.source 2460-6545
dc.subject Manajemen
dc.subject Metode Material Requirement Planning, Bill Of Material, Lot For Lot, Periode Part Balancing
dc.subject
dc.subject
dc.title Analisis Perencanaan Persediaan Bahan Baku pada Produk Knalpot Matic SND Semi Racing Harian Motor Honda Beat dengan Menggunakan Metode MRP (Material Requirement Planning) untuk Meminimumkan Biaya Persediaan di PT. Sandy Globalindo Bandung
dc.title ANALISIS PERENCANAAN PERSEDIAAN BAHAN BAKU PADA PRODUK KNALPOT MATIC SND SEMI RACING HARIAN MOTOR HONDA BEAT DENGAN MENGGUNAKAN METODE MRP (MATERIAL REQUIREMENT PLANNING) UNTUK MEMINIMUMKAN BIAYA PERSEDIAAN DI PT. SANDY GLOBALINDO BANDUNG
dc.type info:eu-repo/semantics/article
dc.type info:eu-repo/semantics/publishedVersion
dc.type Peer-reviewed Article
dc.type Kuantitatif
dc.type


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search Unisba Repository


Browse

My Account