Universitas Islam Bandung Repository

Technical And Budgeting Plan For Sand Mining Reclamation On Block 4 Area 3 Ha Widthat PT Bunkasarana Pratama Cibinong Hilir, Kecamatan Cilaku, Kabupaten Cianjur, West Java

Show simple item record

dc.contributor.author Hilmansyah, Derry
dc.contributor.author Pulungan, Linda
dc.contributor.author Usman, Dudi Nasrudin
dc.date.accessioned 2021-07-19T06:27:15Z
dc.date.available 2021-07-19T06:27:15Z
dc.date.issued 2016-02
dc.identifier.uri http://karyailmiah.unisba.ac.id/index.php/pertambangan/article/view/2890
dc.identifier.uri http://hdl.handle.net/123456789/29949
dc.description.abstract PT. Bunkasarana Pratama is in Cibinong Village, District Cilaku, Cianjur, West Java Province, A company in Indonesia is Engaged in Mining Commodities Non Metal And Stone ( Sand ). On essentially mining activities can be changing the form of the earth. To fix the appearance of the earth form or to switch the function of mining land, So every company engaged in mining industries are required to do reclamation the form of the earth and the damaged ecosystems by mining activities. The Reclamations activities planned by PT. Bunkasarana Pratama it was started with use planning land and to spread topsoil. This activity is done with using mechanical tools. After the activities spreading top soil, then made drainage system. If activity of use planning Land And making drainage system has been finished, then to do the activities of calcification and revegetation some point. Liming activity is done to improve the soil nutrient element before planted by a protector Plants or staple crops. Reclamation activities at PT. Bunkasarana Pratama is divided into 5 Years, every years, is expected to be finished in time period of 2-3 months. Reclamation costs incurred by PT. Bunkasarana Pratama every year consists From 2 Components that is direct cost (use planning land and to spread topsoil = ± Rp 458.000.000,- , made drainage system drainage = ± Rp 3.000.000,- , Liming activity = ± Rp. 4.200.000,- , revegetation And Treatment = ± Rp 6.000.000,-), and indirect costs (mobilization and demobilization costs = ± Rp 60.000.000,- , the cost of the reclamation plan = ± Rp 40.000.000,- supervision cost = ± Rp 30.000.000,-). en_US
dc.language.iso en en_US
dc.publisher Pusat Penerbitan Universitas Islam Bandung en_US
dc.subject Sand mining, Reclamation, and Reclamation costs en_US
dc.title Technical And Budgeting Plan For Sand Mining Reclamation On Block 4 Area 3 Ha Widthat PT Bunkasarana Pratama Cibinong Hilir, Kecamatan Cilaku, Kabupaten Cianjur, West Java en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Unisba Repository


Browse

My Account