Universitas Islam Bandung Repository

Analisis Kinerja Pabrik Peremuk (Crushing Plant) Batuan Andesit dalam Upaya Memaksimalkan Kapasitas Produksi di PT Lotus SG Lestari

Show simple item record

dc.contributor.author Gantara, Baradipo
dc.contributor.author PULUNGAN, Linda
dc.contributor.author Guntoro, Dono
dc.date.accessioned 2021-07-19T08:17:26Z
dc.date.available 2021-07-19T08:17:26Z
dc.date.issued 2016-08
dc.identifier.uri http://karyailmiah.unisba.ac.id/index.php/pertambangan/article/view/4846
dc.identifier.uri http://hdl.handle.net/123456789/29950
dc.description.abstract Crushing plant is one of the processing unit that consist of many tools which continue cycle and it aims to reduce small materials, that process is the beginning step and most important things of comminution process. Peformence Analysis of Crushing Plan A with heavy equipment productivity which some actual fact are aims to know between work peformence of heavy equipment with production target. Productivity of crushing plan can be worse when some troble in crushing plan are happen at a time, the biggest impact of that trouble is The production does not according with target planned. For example, company set target production at 5805 ton/day but the actual fact just 5506,312 ton/day. The result calculation at Primary Crushing step: Mechanical Avability (MA)= 98,21 %, Physical Avability (PA) = 82,32 %, Use of Avability (UA)= 82,06%, Effective of Utilization (EU)= 80,85%, Production rate Index (PRI)= 89,335%,Overal Equipment Effectiveness (OEE)= 87,736 %. The result calculation at Secondary Crushing step: Mechanical Avability (MA)= 98,33%, Physical Avability (PA) = 80,92%, Use of Avability (UA)= 98,64%, Effective of Utilization (EU)= 80,85%, Production rate Index (PRI)= 88,206%,Overal Equipment Effectiveness (OEE)= 86,88%. The result Calculation at Tertiery Crushing step: Mechanical Avability (MA)= 98,33%, Physical Avability (PA) = 80,92%, Use of Avability (UA)= 98,64%, Effective of Utilization (EU)= 80,85%, Production rate Index (PRI)= 79,315%,Overal Equipment Effectiveness (OEE)= 80,52%. en_US
dc.language.iso en en_US
dc.publisher Pusat Penerbitan Universitas Islam Bandung en_US
dc.subject Crushing Plan, Production, Productivity, Productin Rate Index, Overal Equipment Effectiveness en_US
dc.title Analisis Kinerja Pabrik Peremuk (Crushing Plant) Batuan Andesit dalam Upaya Memaksimalkan Kapasitas Produksi di PT Lotus SG Lestari en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Unisba Repository


Advanced Search

Browse

My Account