dc.contributor |
|
|
dc.contributor |
|
|
dc.creator |
Siti, Silviana |
|
dc.creator |
Ramdani, Yani |
|
dc.creator |
Hirji, Farid |
|
dc.date |
2017-01-25 |
|
dc.identifier |
http://karyailmiah.unisba.ac.id/index.php/matematika/article/view/5785 |
|
dc.description |
The construction of the swimming pool and garden is a construction on a large scale that requires the presence of scheduling. The scheduling is done because this project has a deadline so requires good management to manage the project in order to streamline resources, to minimize risk, and to get optimal results. One of methods to solve the above problems use Critical Path Method (CPM). CPM is used in order to determine the fastest time. The results of the calculation with the CPM against the construction project of the swimming pool with an area of 122 m3 and garden 300 m2 is 72 days. |
|
dc.description |
Pembangunan kolam renang dan taman merupakan pembangunan dalam skala besar yang memerlukan adanya penjadwalan. Penjadwalan dilakukan karena proyek ini memiliki batas waktu sehingga memerlukan manajemen yang baik untuk mengelola proyek agar dapat mengefisienkan sumber daya, meminimalkan risiko, dan mendapat hasil yang optimal. Salah satu metode untuk menyelesaikan persolalan di atas adalah menggunakan Critical Path Method (CPM). CPM digunakan agar dapat menentukan waktu tercepat. Hasil perhitungan dengan CPM terhadap proyek pembangunan kolam renang dengan luas 122 m3 dan luas taman 300 m2 adalah 72 hari. |
|
dc.format |
application/pdf |
|
dc.language |
ind |
|
dc.publisher |
Universitas Islam Bandung |
|
dc.relation |
http://karyailmiah.unisba.ac.id/index.php/matematika/article/view/5785/pdf |
|
dc.rights |
Copyright (c) 2017 Prosiding Matematika |
|
dc.source |
Prosiding Matematika; Vol 3, No 1, Prosiding Matematika (Februari, 2017); 1-8 |
|
dc.source |
Prosiding Matematika; Vol 3, No 1, Prosiding Matematika (Februari, 2017); 1-8 |
|
dc.source |
2460-6464 |
|
dc.subject |
|
|
dc.subject |
Scheduling, Project Management, CPM. |
|
dc.subject |
Matematika;Analisis Jaringan |
|
dc.subject |
Keywords: Scheduling, Project Management, CPM. Kata Kunci : Penjadwalan, Manajemen proyek, CPM. |
|
dc.title |
Construction Project Scheduling Pool and Garden using Critical Path Method(CPM) |
|
dc.title |
Penjadwalan Proyek Pembangunan Kolam Renang dan Taman Menggunakan Critical Path Method (CPM) |
|
dc.type |
info:eu-repo/semantics/article |
|
dc.type |
info:eu-repo/semantics/publishedVersion |
|
dc.type |
Peer-reviewed Article |
|
dc.type |
|
|
dc.type |
Critical Path Method |
|