Universitas Islam Bandung Repository

Pengukuran Beban Kerja Mental untuk Penentuan Jumlah Tenaga Kerja Optimal Karyawan pada Stasiun Kerja Tenun di PD.Tenun ATBM Faishal Ridwan (Garut)

Show simple item record

dc.contributor Fakultas Teknik
dc.contributor
dc.creator Rosiansyah, Egi
dc.creator D, Nugraha
dc.creator As'ad, Nur Rahman
dc.date 2018-01-27
dc.date.accessioned 2019-09-12T02:08:11Z
dc.date.available 2019-09-12T02:08:11Z
dc.identifier http://karyailmiah.unisba.ac.id/index.php/industri/article/view/10084
dc.identifier.uri http://hdl.handle.net/123456789/22849
dc.description Abstract. The development of an increasingly advanced and competitive industrial world requires the company to make continuous adjustments. The high level of competition in the industry ultimately requires companies to determine the right strategies in order to maintain productivity so that profits will continue to increase. The study aims to determine the number of employees based on the operator's mental load on the PD weaving station. ATBM Faishal Ridwan. In this study the methods used are NASA-TLX and Work Sampling. The result obtained is in the form of optimal employee workforce for station Weaving. Keywords: NASA-TLX, Work Sampling, Workload, Number of EmployeesAbstrak. Perkembangan dunia industri yang semakin maju dan kompetitif, menuntut perusahaan untuk melakukan penyesuaian secara terus-menerus. Tingkat persaingan yang tinggi dalam industri ini akhirnya mengharuskan perusahaan untuk menentukan strategi-strategi yang tepat agar dapat menjaga produktivitas sehingga keuntungan yang didapatkan akan terus meningkat. Penelitian bertujuan untuk menentukan jumlah karyawan berdasarkan beban mental operator pada stasiun tenun PD. ATBM Faishal Ridwan. Dalam penelitian ini metode yang digunakan yaitu NASA-TLX dan Work Sampling. Hasil yang diperoleh yaitu berupa jumlah tenaga kerja optimal karyawan untuk stasiun Tenun.Kata Kunci : NASA-TLX, Work Sampling, beban kerja, Jumlah Karyawan
dc.description Abstrak : Perkembangan dunia industri yang semakin maju dan kompetitif, menuntut perusahaan untuk melakukan penyesuaian secara terus-menerus. Tingkat persaingan yang tinggi dalam industri ini akhirnya mengharuskan perusahaan untuk menentukan strategi-strategi yang tepat agar dapat menjaga produktivitas sehingga keuntungan yang didapatkan akan terus meningkat. Penelitian bertujuan untuk menentukan jumlah karyawan berdasarkan beban mental operator pada stasiun tenun PD. ATBM Faishal Ridwan. Dalam penelitian ini metode yang digunakan yaitu NASA-TLX dan Work Sampling. Hasil yag diperoleh yaitu berupa jumlah tenaga kerja optimal karyawan untuk stasiun Tenun.Kata Kunci : NASA-TLX, Work Sampling, beban kerja, Jumlah Karyawan.Abstract: The development of an increasingly advanced and competitive industrial world. The high competition in this industry in the end there is a company to determine the right strategy in order to maintain productivity in order to continue to increase. This study aims to determine the number of employees according to mental operators on the woven station PD. ATBM Faishal Ridwan. In this study the methods used are NASA-TLX and Work Sampling. Yag produces optimal labor output for Weavingperator mental load station at PD weaving station. ATBM Faishal Ridwan. In this study the methods used are NASA-TLX and Work Sampling. Which results in the optimal employee workfor station Weaving for the station WeavingKeywords: NASA-TLX, Work Sampling, Workload, Number of Employees.
dc.format application/pdf
dc.language eng
dc.publisher Universitas Islam Bandung
dc.relation http://karyailmiah.unisba.ac.id/index.php/industri/article/view/10084/pdf
dc.rights Copyright (c) 2018 Prosiding Teknik Industri
dc.source Prosiding Teknik Industri; Vol 4, No 1, Prosiding Teknik Industri (Februari, 2018); 164-168
dc.source Prosiding Teknik Industri; Vol 4, No 1, Prosiding Teknik Industri (Februari, 2018); 164-168
dc.source 2460-6502
dc.subject Teknik Industri
dc.subject NASA-TLX, Work Sampling, beban kerja, Jumlah Karyawan
dc.subject
dc.subject Kata Kunci : NASA-TLX, Work Sampling, beban kerja, Jumlah Karyawan.Keywords: NASA-TLX, Work Sampling, Workload, Number of Employees.
dc.title Pengukuran Beban Kerja Mental untuk Penentuan Jumlah Tenaga Kerja Optimal Karyawan pada Stasiun Kerja Tenun di PD.Tenun ATBM Faishal Ridwan (Garut)
dc.title PENGUKURAN BEBAN KERJA MENTAL UNTUK PENENTUAN TENAGA KERJA OPTIMAL KARYAWAN STASIUN TENUN DI PD. ATBM FAISHAL RIDWAN (GARUT)
dc.type info:eu-repo/semantics/article
dc.type info:eu-repo/semantics/publishedVersion
dc.type Peer-reviewed Article
dc.type Kualitatif
dc.type


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search Unisba Repository


Browse

My Account